Saraburi Project: Update

The original layout plan.

As of December 2010. It has changed color to orange, and the
roof slopes down over the back kitchen area for practical
considerations.

Front elevation view.

Viewing inward to the still unfinished interior, exterior ornaments added
during construction can be seen including lighting glass blocks.

Stage two consists of an on-site workshop. Above is a preliminary
concept of one direction the workshop can go in.

This residential project has been moving along over the course of the last year since the last post found here. Several additional layouts have been produced for window and lighting placement and now concepts are being proposed for an on-site workshop area and a smaller separate room for guests.